The best adaptations for later life are decided long before anyone needs them, and planned so that the house never looks adapted at all.

Home adaptations are usually thought of as something done to a house once it has become harder to live in: a rail here, a ramp there, a stair-lift fixed to the principal stair. In a London townhouse that approach rarely ends well. The house is tall and narrow, its rooms stacked over four or five floors, and every change made late has to be fitted around finishes that were never meant to move.

The families we work with increasingly ask a different question at the start of a project. Not how to adapt the house later, but how to plan it now so that it can change with them over decades: a house for young children, then for grown children who come and go, then for a couple who may one day prefer not to climb to the top floor. Answered early, almost all of it is invisible.

This piece sets out where those decisions sit, which belong in the first drawings and which can safely wait. It draws on the practice’s experience of designing and managing work on period and new houses since 1987, and it is about design rather than care: what the house needs, not what any one person does.

Why home adaptations belong in the first drawings

The building regulations already recognise the idea. Approved Document M, the government’s guidance on access to and use of dwellings, describes three categories of home: visitable, accessible and adaptable, and wheelchair user. Only the first applies by default; the other two apply to new homes where a planning condition requires them. A private renovation is not bound by the second category, but it is a useful checklist of what an adaptable house contains: a step-free approach, a WC on the entrance storey, a stair wide enough to take a stair-lift, and bathroom walls strong enough to carry grab rails and seats later.

What the document cannot show is cost. In our experience, the difference between planning for these things and retrofitting them is not one of degree. A wall made strong enough to take a rail costs very little when it is first framed out; reinforcing it after the panelling is up means taking the panelling down. A shaft planned through five floors is a line on a drawing; adding one later means opening up the structure of a finished house. That is why the conversation belongs at the beginning, alongside the brief for the kitchen and the principal suite, rather than in a separate document at the end.

The lift: a shaft that costs little to plan and a great deal to add

In a townhouse, the lift is the single decision that most affects how long a family can stay. We have written separately about the practical questions of installing a lift in a historic townhouse: the pit, the headroom, the structure and the consents. The point here is simpler. Even where a family does not want a lift now, it is often worth reserving the space for one: a stack of cupboards or stores, one on every floor, in a position the structure can accept, which can later become a shaft without touching a principal room.

Where the lift is installed from the start, it should be designed as part of the house rather than as equipment. A car lined in the same timber as the joinery on the landings, doors that read as panelling, a bench seat and good light make it a small room in its own right. Placed beside the stair rather than inside its well, it leaves the stair as the house intended.

Level floors, wider doors and a stair that can take a rail

Level thresholds are the quietest of the changes and among the most valuable. Where a stone hall meets an oak floor, the two can be brought to the same level with a fine metal strip between them, rather than a step or a raised saddle. Door openings on the principal floors can be made a little wider than the minimum, which suits the proportions of a period house in any case. Approved Document M asks for a clear opening of 850mm at the entrance door of an adaptable home and halls at least 900mm wide; most London houses of quality are generous enough to meet that without anyone noticing.

The stair matters too. A principal stair that is comfortable to climb, with a continuous handrail that can be gripped along its whole length, will serve for longer than one made grand at the expense of its going. Where a second rail may one day be wanted, its fixings can be allowed for in the wall now, and the plaster finished over them.

Rooms that can change purpose

The most useful room in an adaptable house is on the ground or garden floor and is not yet a bedroom. A study, a library or a guest room close to a well-planned bathroom can become the principal bedroom in a weekend, with nothing to build. For that to work, it needs the proportions for a large bed, a window onto the garden, a door wide enough to move furniture through, and a bathroom that can be reached without crossing the hall.

That bathroom is where planning shows most. A level-access shower in stone, with a bench seat built in from the start, reads as luxury rather than adaptation. Rails can be designed as heated towel rails in bronze or nickel, fixed into walls reinforced to take them. Nothing in the room needs to announce what it might one day be for. Approved Document M asks that an adaptable home’s bathroom sits on the same floor as the principal double bedroom; in a tall house, it is worth deciding early which floor that could become.

Other rooms can be planned to change in the same way. A room near the kitchen can later suit a housekeeper or member of staff who lives in. A top-floor suite for children can become a self-contained flat for grown-up children or guests. With one accountable team for design and project management, these choices are drawn, costed and delivered together rather than added piecemeal, which is how we approach construction and project management on every house.